Modernization of generating equipment of unit № 6 of Kozloduy NPP

mark-symbol Bulgaria
factory Kozloduy NPP (Bulgaria)
calendar 12.02.2013 − 31.12.2015
Despite the complexity of the project, , it has been successfully implemented by the parties. At the moment, all the equipment is working according to its design characteristics. Modernization in the long term will increase the capacity of the power unit to 104% of the nominal.
Delivery of the new stator, the reconstruction of the rotor generator of TVV-1000-4 U3 and reconstruction of BVD pathogen-4600-1500 U3 to provide work for the 1100MW. The first project of "Rusatom Service" for the NPP "Kozloduy" was modernization of the generating equipment of unit № 6. The contract was signed on 02.12.2013. The rotor of the turbine generator was taken to St. Petersburg to be repaired, and in August 2014 all equipment under the contract have been delivered to the site. Hardware manufacturer is Power Machines OJSC. During the outage in September and October 2014 on the unit 6 the modernization of the pathogen was successfully performed . In the course of BPD in May 2015 on the block number 5 modernized turbine generator rotor was installed and put into operation in the place of the prvious one. In September and October 2015 the project was completed after the successful installation and commissioning of the new turbine generator stator of Unit #6 in the presence of chief engineers from the manufacturer
Results
Despite the complexity of the project, , it has been successfully implemented by the parties. At the moment, all the equipment is working according to its design characteristics. Modernization in the long term will increase the capacity of the power unit to 104% of the nominal.