Rusatom Service JSC provides integrated solutions to modernize systems and equipment of nuclear and thermal power plants.

Rusatom Service JSC performs a wide range of works, including “turnkey”, such as:
иконка - examination and justification of the residual life of non-replaceable elements, including non-destructive testing of metal, performing the necessary calculations examination and justification of the residual life of non-replaceable elements, including non-destructive testing of metal, performing the necessary calculations
иконка - development of design and working documentation and safety justifications development of design and working documentation and safety justifications
иконка - supply of basic equipment, auxiliary and consumables supply of basic equipment, auxiliary and consumables
иконка - commissioning, including development of NDT and testing programs commissioning, including development of NDT and testing programs
иконка - comprehensive testing and commissioning comprehensive testing and commissioning
иконка - execution of dismantling and construction and installation works execution of dismantling and construction and installation works
иконка - development of projects for the production of works (PPR) and technological documentation development of projects for the production of works (PPR) and technological documentation
иконка - certification of welding technology in accordance with the current ND certification of welding technology in accordance with the current ND
иконка - supervision by the designer and supervision by the manufacturers supervision by the designer and supervision by the manufacturers
иконка - preparation of executive documentation on the results of the work preparation of executive documentation on the results of the work
иконка - quality control of installation and construction works quality control of installation and construction works

Modernization allows to significantly increase the safety level of the power unit, extends the service life of its systems and equipment, and improves their specifications and operability.

Projects

Rusatom Service JSC has experience in modernization projects for systems and equipment both at Russian power facilities and abroad - Armenia, Bulgaria, etc.

As part of the project to extend the service life of Armenian NPP Power Unit No. 2, a comprehensive modernization of systems and equipment was carried out as a general contractor, namely:

  • reactor vessel recovery heat treatment (annealing);
  • pgrade of 2 turbine generators with capacity increase (replacement of turbines, condensers, moisture steam reheater (MSR), turbine generators, condensate electric pump (CEP) excitation systems);
  • replacement of 2 unit transformers, generator conductors, RPA;
  • emergency core cooling system upgrade;
  • spray system upgrade;
  • upgrade of the reliable power supply system, including the ventilation and air conditioning system;
  • upgrade of the ventilation and air conditioning system of the emergency boron input unit; turbine generators overhaul;
  • auxiliary diagrams upgrade;
  • fire extinguishing system upgrade;
  • screwdriver upgrade;
  • and other.
Продление срока эксплуатации

As part of the above mentioned works, more than 3,000 tons of new equipment and materials were delivered to Armenian NPP and more than 800 people were employed to perform the works.

The upgrade resulted in a >15% increase in power generation at the power unit.

! The works were performed within limited timeframes during periods of planned preventive maintenance without long-term power unit shutdown and under conditions of worn-out transportation infrastructure and transportation isolation of the Republic of Armenia.
отжиг корпуса реактора отжиг корпуса реактора отжиг корпуса реактора
Reactor vessel recovery heat treatment (annealing) (Armenian NPP)
Turbine equipment upgrade. Dismantling and installation of LPC *Dismantling and installation with saving the building structures.
Модернизация турбинного оборудования Модернизация турбинного оборудования Модернизация турбинного оборудования Модернизация турбинного оборудования
Модернизация турбинного оборудования Модернизация турбинного оборудования Модернизация турбинного оборудования
Turbine equipment upgrade (Armenian NPP)Turbine (K-220) and turbine generators (TVV-220)
Модернизация системы аварийного охлаждения Модернизация системы аварийного охлаждения Модернизация системы аварийного охлаждения Модернизация системы аварийного охлаждения
Modernization of emergency core cooling system
Rusatom Service JSC implemented a number of works to upgrade systems and equipment for Kozloduy NPP in the Republic of Bulgaria:
АЭС «Козлодуй» в Республике Болгария
  • upgrade of neutron flux monitoring equipment (NFME) - “turnkey” project;
  • replacement of PGV-1000M steam generators air vents pipelines (design, manufacture and delivery);
  • upgrade of generator equipment;
  • and other.

The projects were implemented according to the norms of the Republic of Bulgaria and the Russian Federation. The upgraded systems and equipment were successfully implemented based on the productive work, resulting in the achievement of the project objectives and increased reliability and safety of the Kozloduy NPP Power Unit No. 6.

Rusatom Service JSC is also involved to upgrade systems and equipment at thermal power facilities in Russia. Thus, under the contract with TGC-16 JSC, works on turbine technical re-equipment with replacement of the high-pressure cylinder for Nizhnekamskaya TPP are currently being carried out. Rusatom Service JSC supplies main and auxiliary equipment with the development of a working documentation set for subsequent installation works. The project is being implemented under the Capacity Contracting Agreement (CCA) program aimed at renewing the existing capacities of thermal power plants in the Russian Federation.